ongoing task 3 to check formating
This commit is contained in:
16
03Module.md
16
03Module.md
@@ -6,8 +6,14 @@ An ERP system from a single vendor can be the only system in use by a company or
|
||||
It's quite common that I try to setup something, but is needed another setting from other part of the system.
|
||||
|
||||
### Sequence
|
||||
- Setup country, city, company
|
||||
1 - Workshop
|
||||
Cancel reason
|
||||
Product approval
|
||||
|
||||
Setting up a **Manufacturing** module require require a keen eye on details, but sometimes not so detailed in order to avoid complications.
|
||||
The sequence to setup the module on my testing [axelor ERP](https://erp.33co.de) instance is the following:
|
||||
1 - Setup Country, City, Company information
|
||||
2 - Create workshop, in [Kartano Tech Oy](https://code.33co.de/ehofmann/ERP-samk/src/branch/master/02Process.md) case is the PCB Workshop, Metal Workshop and Assembly Workshop
|
||||
3 - Add cancel reasons, during setup I do not know what is the need of such *Cancel Reasons*, I considered as issues in production that could cancel an order
|
||||
4 - Product approvals, in this item I created inspection step that will approve the product, to be validated at the end.
|
||||
5 - Machine types. In this case I added twelve type of machines that are necessary to create PCB *"Printed Circuit Boards"*
|
||||
6 - Machines. Here I added the machine that is producing according each manufacturing step. Each machine belong to a *Machine Type* group.
|
||||
7 - Work Centers. Here machines are grouped in order to produce the product, also capacity and costing settings are defined. I will need to return to this settings after adding products to the system, as this information is necessary to define the process cost.
|
||||
|
||||
|
||||
|
||||
Reference in New Issue
Block a user