testing format
This commit is contained in:
16
03Module.md
16
03Module.md
@@ -2,10 +2,10 @@
|
||||
|
||||
An ERP system from a single vendor can be the only system in use by a company or a part, a component, of the entire ERP solution of a company that use several vendors. Each ERP system is conceived as a group of modules, that interact with information flow between the modules ou exporting and importing data between different solutions.
|
||||
|
||||
## Setting up
|
||||
It's quite common that I try to setup something, but is needed another setting from other part of the system.
|
||||
## Details
|
||||
In order to evaluate one module, for this exercise the **Manufactuing** module, the approach is to configure the module and identify the interaction with others modules as well the difficulties or pecularities during the task execution.
|
||||
|
||||
### Module Configuration
|
||||
## Module Configuration
|
||||
Setting up a **Manufacturing** module require a keen eye on details, but sometimes not so detailed in order to avoid complications.
|
||||
The sequence to setup the module on my testing [axelor ERP](https://erp.33co.de) instance is the following:
|
||||
1. Setup Country, City, Company information
|
||||
@@ -16,6 +16,12 @@ The sequence to setup the module on my testing [axelor ERP](https://erp.33co.de)
|
||||
6. Machines. Here I added the machine that is producing according each manufacturing step. Each machine belong to a *Machine Type* group.
|
||||
7. Work Centers. Here machines are grouped in order to produce the product, also capacity and costing settings are defined. I will need to return to this settings after adding products to the system, as this information is necessary to define the process cost.
|
||||
|
||||
### Creating orders
|
||||
Still some configurations are empty or not clear what is the requirements, by checking the [documentation](https://docs.axelor.com/abs/5.0/functional/manufacturing.html#introduction) I decide to follow the manual flow and configure the product.
|
||||
## Creating orders
|
||||
Still some configurations are empty or not clear what are the requirements, by checking the [documentation](https://docs.axelor.com/abs/5.0/functional/manufacturing.html#introduction) I decide to follow the manual flow and configure the product.
|
||||
|
||||
## Integration
|
||||
Several occasions during the configuration of the **Manufacturing** module the system show messages requesting to setup another module in order to continue the configuration or even to use the manufacturing module to create a work order.
|
||||

|
||||
The example below ilustrate the message when I was trying to create a work order, then the system require a product to be created and during the product creation that can be on the **Manufacturing** module or in the **Stock Management** module, the system show a message requesting to configure the *Stock Management* module.
|
||||

|
||||
|
||||
|
||||
BIN
assigments/img/03-errorMessage.png
Normal file
BIN
assigments/img/03-errorMessage.png
Normal file
Binary file not shown.
|
After Width: | Height: | Size: 60 KiB |
BIN
assigments/img/03-productempty.png
Normal file
BIN
assigments/img/03-productempty.png
Normal file
Binary file not shown.
|
After Width: | Height: | Size: 29 KiB |
Reference in New Issue
Block a user